CHAPTER 5 ESTIMATING WORK ITEMS COSTS, IDIRECT .

CHAPTER 5 ESTIMATING WORK ITEMS COSTS, IDIRECT .

It is required to determine the unit price for plain concrete given the following information: Plain concrete (PC) quantity = 1080 m3. One cubic meter of PC comprises of 250 kg cement; m3 gravel and m3 sand. The prices of these materials are LE500/ton; LE80/m3 .

Get Price
Concrete Calculator Price per m3 | Allied Concrete

Concrete Calculator Price per m3 | Allied Concrete

Concrete prices in New Zealand are based on a per cubic metre rate, therefore when enquiring about price you will need to provide the concrete volume required. Use the concrete calculator below to work out the volume of the area to be filled.

Get Price
what is cost of 1 cubic meter m25 concrete BINQ Mining

what is cost of 1 cubic meter m25 concrete BINQ Mining

sand and gravel required for m25 grade concrete for 1 cubic meter .. Below is some information about the products equipment, if you puzzle about the price、the factory、the model and the photo of YEC production, or want to know more . »More detailed

Get Price
What is the procedure to calculate cement bags in 1 cubic ...

What is the procedure to calculate cement bags in 1 cubic ...

No. of bags required for 01 cum of concrete = 1/ = 6 bags From above, if the concrete mix is 1:2:4(by volume), to get a cubic meter of concrete we require Cement = 6 bags = 300 kgs.

Get Price
Concrete Volume Cost Calculator using Metric Measurements

Concrete Volume Cost Calculator using Metric Measurements

To use this calculator you need to know the square metres of the area you need to pour concrete in. It can be length x width of a slab, height x length of a footing or wall, anything you can calculate square metres from. Enter the required depth or thickness and the cost of one cubic metre of concrete. A percentage of waste can be added if ...

Get Price
Cost of Concreting Per m3 (Cubic Metre)

Cost of Concreting Per m3 (Cubic Metre)

Calculating the costs of concreting in three dimensions (per cubic metre) is different than square metre rates. The supply cost of concreting starts from roughly 300 per cubic metre, while labour costs for hiring concreters run from 80/hr.

Get Price
Concrete 1 pound mass to cubic meters converter

Concrete 1 pound mass to cubic meters converter

One pound of concrete converted to cubic meter equals to m3. The answer is: The change of 1 lb ( pound ) unit of concrete measure equals = to m3 ( cubic meter ) as the equivalent measure for the same concrete type. In principle with any measuring task, switched on professional people always ensure, and their success depends on,...

Get Price
Quantity and Rate Analysis for Reinforced Concrete ...

Quantity and Rate Analysis for Reinforced Concrete ...

For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place. The sum total of all the four items above will give the rate or cost for 1m 3 of concrete.

Get Price
A Guide To Concrete Prices

A Guide To Concrete Prices

Aug 17, 2018· Ready Mix Concrete Prices Readymixed concrete is sold by the volume, so it's essential to know the area you're filling. The price of concrete depends on many factors, including where you're located and the type you've ordered. However, in general, you should be looking at a cost of between £65 and £85 per cubic metre.

Get Price
how must steel will use for 1 cubic of steel ...

how must steel will use for 1 cubic of steel ...

how must steel will use for 1 cubic of steel for beam,column,lantern... Answer / fahad ... how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg . ... 0 Answers one steel fixers how much ton steel fabrication he will do same how much tone he will binding? 0 Answers Simplex, PN, why cracks are being developed in ...

Get Price
How many bags of cement are in a cubic meter of concrete?

How many bags of cement are in a cubic meter of concrete?

One cubic meter of concrete is equal to cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or kg bags of cement.

Get Price
View topic Concrete Price per meter cube m3 • Home ...

View topic Concrete Price per meter cube m3 • Home ...

Dec 11, 2018· Concrete Price per meter cube m3. I'm semirural and paid 260 for 20/20. Owner Build thread..... I live in Sydney. Just paid delivered for metres cubed of 20mpa for a driveway crossover. delivered for mesh and to install. Absolute robbery. We paid two and a half years ago for our slab, and 215 a month ago for our driveway.

Get Price
how many average of shuttering in one cubic meter concrete

how many average of shuttering in one cubic meter concrete

Approximate Shuttering value 1: it is standard shuttering volume. The standard column size 300 mm X 450 mm, Slab thk is 125 mm, plinth beam 230 mm X 350 mm, Beam/ slab beam 230 mm X 450 and foundation shuttering will less then above average shuttering quantity Sqm per cubic meter. how many average of shuttering in one cubic meter concrete..

Get Price
Concrete Sampling Civil/Environmental engineering ...

Concrete Sampling Civil/Environmental engineering ...

Lacking those documents, the standard specifications for concrete call for at least one composite sample for each 75 cubic meters. The building code specifications call for at least one composite sample for each 115 cubic meters.

Get Price
Calculate Quantities of Materials for Concrete Cement ...

Calculate Quantities of Materials for Concrete Cement ...

Thus, for the proportion of mix considered, with one bag of cement of 50 kg, m 3 of concrete can be produced. We have considered an entrained air of 2%. Thus the actual volume of concrete for 1 cubic meter of compacted concrete construction will be = 1 = m 3.

Get Price
Scenario 1

Scenario 1

Again assume the concrete is per metre. Unfortunately, somebody forgot to check the depth of the pavement and it was actually deep. The actual amount needed was 3 cubic metres.